Sample Projects
Structural inspection and construction planning of the rotted sill beam.
Rotted sill
Temparary support
Sill replacement
Final finish
Structural inspection, code compliance assessment, and load analysis for 250,000 Sq.Ft of commercial buildings for WAREHAOUSE STORAGE use.
Conceptual and structural design and construction administration Crew Transfer Training Facility - Massachusetts Maritime Academy
Retaining Wall structural design and Construction administration
Before
After
Structural design and const. admin. fly stair
Before
Demo
After
Load bearing wall removal structural design
Before
After
Window Well structural design
Long span LVL beam structural design and final construction control document certification
Before
Before
After
After
Structural inspection of a cracked foundation wall, structural design and construction administration of a new support system with associated footing
Before
After
Structural design and construction administration of a roof deck